Targets 6.1, 6.b
Community purification and distribution points give riverine households drinking water that meets national standards, managed by local water committees.
Clean water · Akwa Ibom · Cross River
Installation of community purification and distribution points in riverine settlements where households draw drinking water from contaminated creeks, paired with water-quality testing and local maintenance training.
Tap a panel to expand the image and caption.
Riverine settlements dependent on untreated surface water.
Community purification and distribution point design.
Routine water-quality testing planned at every site.
Illustrative programme imagery. Site photography will replace these images once field work begins.
Quarter 1–2
ActiveHousehold water survey, source testing and site selection with community leaders.
Quarter 3
PlannedTechnology selection for creek water, supplier selection and site preparation.
Quarter 4–6
PlannedPhased installation of purification units and distribution points.
Quarter 7–8
PlannedLocal caretaker training, spare-part supply and handover to community water committees.
Indicative envelope: ₦3.2bn (approx. US$2.1m). Allocations are planning estimates pending partner approval and procurement.
Purification systems
48%
Treatment units, tanks, pumps and distribution points.
Installation and civil works
24%
Site preparation, platforms and plumbing in riverine terrain.
Water-quality testing
11%
Baseline and routine testing at every site.
Maintenance training
11%
Caretaker training, toolkits and first-year spare parts.
Programme management
6%
Coordination, monitoring and reporting.
Targets set for the programme. They describe what delivery is designed to achieve, not results already recorded.
75,000
People with safe water access
How it is measured: Household counts at served distribution points.
45
Community systems installed
How it is measured: Commissioning certificates per site.
100% at handover
Sites meeting drinking-water standards
How it is measured: Independent water-quality testing.
90%
Systems operating at 12 months
How it is measured: Maintenance audit one year after handover.
How this programme is designed to contribute to the 2030 Agenda. Goal and target references follow the official UN framework at sdgs.un.org/goals.
Targets 6.1, 6.b
Community purification and distribution points give riverine households drinking water that meets national standards, managed by local water committees.
Targets 3.3, 3.9
Replacing untreated creek water reduces diarrhoeal and waterborne disease linked to contaminated surface sources.
Target 11.1
Riverine settlements gain durable basic services designed for creek terrain and maintained locally.
Target 1.4
Reliable safe water cuts household spending on treatment and illness and returns time to work and schooling.
Target 17.17
Installations are delivered with state water agencies and handed to community committees under agreed maintenance terms.
Alignment is stated by the League for programme design purposes. It does not imply endorsement by the United Nations or any UN agency.